It is very slow progress on the re-urbanisation of calle Carabeo and there is still a long, long way to go before it is finished and it is looking like it will be well over schedule, much like the first phase of works on this street.
At the moment, it is actually possible to walk the entire length of the street although a better route is still via the Los Huertos car park as the niff from the drains can be quite potent.