Work has actuallt started on the renovation of calle El Barrio in Nerja, a few green markings placed on the road on Monday and today a series of holes drilled into the pavement and steel bars inserted.
Although the first phase is supposed to be from Plaza Cavana to the cafe El Barrio, the poles are being placed along the entire length of the street and the storage hut is almost at the avenida Castilla Perez end of the road.