Replacement of rusty railings

Railing replacementWork has started to replace the guard railings at the bottom of Plaza Fabrica de los Cangrejos near Torrecilla beach, the railings having deteriorated since their installation in 2000 by the Department of Coasts.

The material used for the railings was not the most suitable for close proximity to the sea and parts have rusted quite considerably. The replacement railings will be stainless steel.

Railing replacement

The work is starting at the Torrecilla beach end which is the most badly affected and the first phase will see the replacement of about 200 metres of railing. The cost of the project is €50,000.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: