Seems like there is still quite a way to go with the works in both calle Iglesia and calle Trancos, neither looking like they will be finished within the specified period.
Calle Los Huertos.
The works in calle Diputación are not particularly creating too much dust, perhaps due to the shielding erected, and there is, rather surprisingly, not much smell, but it is certainly VERY noisy when the machinery is in full swing.