Work has been completed on a breakwater to collect excess rainwater in which runs under the market site in Almijara.
Construction begins on breakwater at Ferrara Playa
Work began today, Tuesday, to repair the regular storm damage to Ferrara Playa in Torrox Costa, although this year is a bit different as a breakwater is being constructed.
Improvements to Chilches beach
The Department of Coasts is set to spend €30,000 to improve the beach area in Chilches, creating a two and a half metre recess in the area designated for parking, installing a breakwater to prevent landslides and improving access to Torre de Chilches. The works will increase the beach size by 500 metres.