The March rains have caused movement of earth on a stretch of the A-92 in Viznar,Granada, at km 250.9, causing damage to the road and serious damage to the retaining wall, built in 2010 at a cost of €329,222.
The March rains have caused movement of earth on a stretch of the A-92 in Viznar,Granada, at km 250.9, causing damage to the road and serious damage to the retaining wall, built in 2010 at a cost of €329,222.